Interior & Construction Material Sourcing Checklist for Contractors and Architects
Key Takeaway
A structured 5-phase procurement timeline ensuring zero project downtime: Structural Prep, Concealed Utilities, Hard Surfaces & Tiling, Fixtures & Fittings, and Final Touchups.
1. Phase 1: Concealed Infrastructure (Plumbing & Electricals)
Concealed conduits, CPVC/UPVC water supply pipes, drainage lines, and FRLS electrical cables must be procured first before wall plastering.
- ISI certified CPVC & PVC pipes and fittings (Class 1 & Class 2)
- Flame Retardant Low Smoke (FRLS) copper wires (1.0 sq.mm to 6.0 sq.mm)
- Concealed flush cisterns, diverters, and stop cocks
2. Phase 2: Flooring, Walls & Tile Adhesives
Source floor tiles, wall tiles, and engineered tile adhesives together with spacer clips to achieve level lippage-free surfaces.
- Vitrified floor tiles and anti-skid bathroom tiles
- Type 1 & Type 2 polymer modified tile adhesives and epoxy grouts
- Waterproofing chemical membranes for sunken slabs and wet areas
Frequently Asked Questions
Can Intrihub provide GST invoices and bulk trade pricing for contractors?
Yes. Intrihub provides full GST compliant input tax credit (ITC) invoices, consolidated project billing, and direct factory wholesale pricing on bulk orders.
Does Intrihub offer multi-drop site deliveries for commercial projects?
Yes. We coordinate phased site deliveries directly to your project location in Bangalore and across major Indian cities.
Need materials for your active site?
Explore factory-direct supplies on Intrihub with site delivery.